INSIDER
Deal reached to fix Detroit Riverfront where dock collapse spilled contaminated soil into river
Read full article: Deal reached to fix Detroit Riverfront where dock collapse spilled contaminated soil into riverDETROIT – A deal has been reached to fix the Detroit Riverfront where a dock collapsed, spilling contaminated soil into the river. On Monday, Revere Dock signed an administrative consent agreement with the Michigan Department of Environment, Great Lakes and Energy. As part of the deal, the restoration work at the site is expected to be done by July 2021. In May, this litigation produced an agreement, requiring Revere Dock, LLC to obtain permits from EGLE and the US Army Corp of Engineers for a dock restoration. In May, this litigation produced an agreement, requiring Revere Dock, LLC to obtain permits from EGLE and the US Army Corp of Engineers for a dock restoration.