Bridge construction to impact downtown Ann Arbor traffic through July
Read full article: Bridge construction to impact downtown Ann Arbor traffic through JulyANN ARBOR, Mich. – Starting at 9 a.m. on Tuesday, downtown Ann Arbor drivers will experience longer commutes as traffic over Broadway Bridge is reduced to one lane in either direction. Lanes will be closed between Swift Street and East Summit Avenue for preventative maintenance repairs to the bridge over Depot Street, the Huron River and the Wolverine Line railroad tracks. Access to the Amtrak long-term parking lot located on the east side of the railroad tracks will be maintained. Signage will direct other pedestrian traffic along Broadway to use the opposite side of the street so that the repairs can continue. Related: Island Drive bridge closed through April 30Want to see more Ann Arbor traffic?